Design Criteria |
|
A.I.S.C. / M.B.MA / A.W.S |
 |
Design |
|
Quick and efficient since standardization of P.E.B. has significantly reduced design time. Basic designs are used over Specialized computer analysis and design programs reduce design time and optimize material required. Drafting is also computerized with minimal manual drawings. Design, detail drawings and erection drawings are supplied free of charge by the manufacturer. Approval drawings may be prepared within 10 days to 3 weeks. Consultant in-house design and drafting design is significantly reduced,
allowing more time for coordination and review. |
 |
Weight |
|
About 30% lighter through the efficient use of steel. Primary framing members are designed with tapered built-up plate sections with the most steel in the areas of highest stress, using high strength steel.
Secondary members are light gage cold formed "Z" or "C" shaped members. Members are roll-formed for minimum weight and labor cost. |
 |
Base Material |
|
Rigid Building P.E.B. System uses almost all steel to meet 50,000 P.S.l. minimum yield including the cladding. |
 |
Foundation |
|
Simple design, easy to construct and lightweight. |
 |
Accessories (Windows, Doors, Ventilation) |
|
Designed to fit the system, with standardized, interchangeable parts, including pre-designed flashing and trims. |
 |
Delivery |
|
Approximately 10-12 weeks |
 |
Erection |
|
Easy, fast, step by step Erection with pre-planning according to given time schedule are accurately known, based
upon extensive experience with similar buildings. |
 |
Architecture |
|
Outstanding architectural design can be achieved at low cost. Conventional wall and fascia materials, such as concrete, masonry and wood, can be utilized. |
 |
Overall Price |
|
Price per square foot may be as much as 40% lower than conventional steel & 40% lower than civil construction depend up on the design. |
 |
Sourcing and Coordination |
|
Building is supplied complete with cladding and all accessories, including erection if required, all under one source of supply, give strong co ordination for the project management. |
 |
Changes |
|
Very flexible, tailor made, accepts changes and revisions easily. Future expansion simple, easy and cost effective. One supplier to coordinate changes. |
 |
Responsibility |
|
Single source of supply results in total responsibility for material quality, work
including design liability. |
 |
Performance |
|
All components have been specified and designed specifically to act together as a system, for maximum efficiency, precise fit up, and performance in the field.
The experience with similar buildings in actual field conditions resulted in design improvements over time which allows dependable prediction of performance. |